Rushton Parish Council

Lower Lane, Eaton, Tarporley, Cheshire, CW6 9AN

Budget: £30,000 - £35,000

Download Case Study

Heartwood - WO106

from £13487

Lilliput Playtown Two - L109

from £5987

Basket Swing - S111

from £2450

Double Swings (Cradle Seat) - S102

from £1545

Spinner without Seating - SR113

from £2798

Swing Barrier - S113

from £245

Dragon Spring Rider (Single) - SR107

from £695

Treadmill - CH126

from £986

Parasol Bench - VW101

from £3498

Noughts & Crosses - PB106

from £745

Park Bench Standard - CP049

from £348

Wetpour Safety Surfacing - SUR101

Price on Enquiry

Rushton Parish Council contacted Creative Play looking to develop a large open grass area across both the Primary School and the Local Community field. We knew this would be a huge and exciting project to work and were looking forward to consulting with both the School and Parish Council to ensure all requirements were met.

DESIGN
With the area of development being so large we provided several different ideas to promote an exciting playground.

Half of the playground development was to incorporate a ‘Play Zone’ and included the Heartwood Tower System, Lilliput Playtown Two, Spinner, Swings and Parasol Shelter. Our large Heartwood Tower was the perfect solution to having a multi-play unit which has rustic features to compliment the natural surroundings of the local village.

We installed a Multi-Use Games Area to the second half of the development to enable sporting activities and team based games. This was designed to enable use by Eaton Primary School during the school day and by the local community in the evening and at weekends.

INSTALLATION
We worked closely with the Parish Council ensuring the whole project ran smoothly, taking photos along the way to show how the development was progressing during each stage.
Half way through the installation, additional play equipment was added to fully utilise the area; these included a Treadmill and Noughts and Crosses play board.
We worked closely with other contractors on site to ensure the whole project was delivered on time for the grand official opening.