Call us now

Rushton Parish Council

Rushton Parish Council

Lower Lane, Eaton, Tarporley, Cheshire, CW6 9AN

Rushton Parish Council contacted Creative Play looking to develop a large open grass area across both the Primary School and the Local Community field. We… Full Details

Budget: £30,000 - £35,000

Heartwood - WO106

£11,868.00 exc. VAT

Lilliput Playtown Two - L109

£5,268.00 exc. VAT

Basket Swing - S111

£2,196.00 exc. VAT

Double Swings (Cradle Seat) - S102

£1,448.00 exc. VAT

Spinner without Seating - SR113

£2,638.00 exc. VAT

Swing Barrier - S113

£216.00 exc. VAT

Dragon Spring Rider (Single) - SR107

£634.00 exc. VAT

Treadmill - CH126

£904.00 exc. VAT

Parasol Bench - VW101

£3,078.00 exc. VAT

Noughts & Crosses - PB106

£656.00 exc. VAT

Park Bench Standard - CP049

£306.00 exc. VAT

Wetpour Safety Surfacing - SUR101

£0.00 exc. VAT

Rushton Parish Council contacted Creative Play looking to develop a large open grass area across both the Primary School and the Local Community field. We knew this would be a huge and exciting project to work and were looking forward to consulting with both the School and Parish Council to ensure all requirements were met.

DESIGN
With the area of development being so large we provided several different ideas to promote an exciting playground.

Half of the playground development was to incorporate a ‘Play Zone’ and included the Heartwood Tower System, Lilliput Playtown Two, Spinner, Swings and Parasol Shelter. Our large Heartwood Tower was the perfect solution to having a multi-play unit which has rustic features to compliment the natural surroundings of the local village.

We installed a Multi-Use Games Area to the second half of the development to enable sporting activities and team based games. This was designed to enable use by Eaton Primary School during the school day and by the local community in the evening and at weekends.

INSTALLATION
We worked closely with the Parish Council ensuring the whole project ran smoothly, taking photos along the way to show how the development was progressing during each stage.
Half way through the installation, additional play equipment was added to fully utilise the area; these included a Treadmill and Noughts and Crosses play board.
We worked closely with other contractors on site to ensure the whole project was delivered on time for the grand official opening.