Search
Generic filters
Exact matches only

Try these: SwingsTowersSlides

Hylands Primary School

Granger Way, Hornchurch, Essex, RM1 2RU

Budget: £25,000 - £30,000

Log Walk - CH114

from £1397

Stilts (4) - CH121

from £748

A-Frame Double Net - CH128

from £1397

Gripped Rope Walk - CH131

from £898

Balance Beam - CH108

from £298

Stepping Logs (4) - CH118

from £398

Rope Walk - CH119

from £998

Clatterbridge - CH106

from £1397

Rubber Mulch Safety Surfacing - SUR102

Price on Enquiry

BRIEF: Hylands Primary School needed some ideas for redevelopment of their playground spaces. The first area they wanted to redevelop was the Early Years playground. They had lots of different ideas in place but were in need of advice as to how to utilise the space available. They also wanted to look at promoting active play as well as incorporating sheltered areas for outdoor learning.

In the Early Years area we installed a Zenith One Tower System. The Zenith range has been designed to provide masses of fun and is a welcome addition within any outdoor play area.

To promote further activity in the playground we installed several items from our Challenger Trim Trail range. Designed to develop upper and lower body strength, improve agility and co-ordination and increase stamina, these popular adventure trails provide children with hours of fun, no matter what their fitness level! Hylands went for several Challenger items including a clatterbridge, stilts, jelly board, stepping logs, rope walks and balance beam to create a fitness trail.

In the last area we installed a 6m Octavia Shelter completed with a Whiteboard add-on. Our shelters are ideal for storytelling and promoting group social activities through learning or play. This 6 metre shelter comes complete with floor, side panels and benches providing seating for up to 35 children making it an ideal outdoor classroom.