Kirk Connel Village Pride Office

Bowman Edgar Park, Kirk Connel, DG4 6RX

Budget: £35,000 - £40,000

Equipment Used

Fort Riley - ZM106

from £15485

Basket Swing - S111

from £2450

Motorbike Spring Rider (Single) - SR110

from £695

Dog Spring Rider (Single) - SR108

from £695

Dragon Spring Rider (Single) - SR107

from £695

Rabbit Spring Rider (Single) - SR103

from £695

Aerial Runway (21M) - ZW101

from £6295

Rubber Mulch Safety Surfacing - SUR102

Price on Enquiry

Description

BRIEF: The council at Kirkconnel wanted to design and develop a play area for the local residents to provide exciting play equipment that would cater for all ages. They needed to get four quotes together to present in a meeting so that the local residents could pick their favourite design. It was important that we listened to their needs and tailored our plans and designs to match. As so many people were involved in the project it was important to create a space that would benefit and enrich the community.