Search
Generic filters
Exact matches only

Try these: SwingsTowersSlides

Blenheim Primary School

Blenheim Road, Orpington, Kent, BR6 9BH

Budget: £20,000 - £25,000

Download Case Study

Jungle Climber Midi - JC102

from £5775

Platform 1.5m (for roof) - JIG1502

POA

Slide 1.5m - JIG1511

POA

Ramp 1.5m - JIG1513

POA

Net Climber - 1.5m - JIG1514

POA

Arched Timber Bridge - JIG201

POA

Inclined Net - CH145

from £1300

Firefighters Pole 1.2m - JIG1217

POA

Platform - 1.2m (for roof) - JIG1202

POA

Log Climber 1.2m - JIG1218

POA

Guard Rail - Timber - JIG101

POA

Roof - Timber - JIG103

POA

Climbing Panel with Blocks - 1.5m - JIG1515

POA

Double Roof - Timber - JIG104

POA

Grass Mats Surfacing - SUR105

Price on Enquiry

BRIEF

After receiving one of our postal brochures, Blehheim Primary School got in touch with Creative Play in regards to updating their existing KS1 and KS2 outdoor play areas. During their consultation they were impressed with our new Jigsaw range and wanted to create challenging yet age-appropriate bespoke Jigsaw Play Towers for both areas.


DESIGN

For the KS1 area we wanted to create an impressive play structure that could be used by all the children during break times. With a 4-tower design we were able to include lots of exciting play features, such as an arched timber bridge, net climber, climbing wall and 2 slide, to encourage age-appropriate risky play.
We included two structures in the KS2 area to provide a wider variety of play opportunities. Again a bespoke Jigsaw Play Tower was created in collaboration with the school, this time a 1.5m high one-tower design, along with our popular Jungle Climber Midi. Together these two play structures are ideal for providing physical play in the playground.
Grass mats were used in both areas to ensure all BSEN 1176 and 1177 requirements were met as well as to prevent the surrounding grass for being worn away during play.


INSTALLATION

With two different custom Jigsaw Play Towers to build, as well as a Jungle Climber Midi, it was essential that everyone worked closely together to ensure everything was installed as Blenheim Primary School had envisioned.
Everyone worked well together and the two finished areas are a real testament to all involved at Creative Play. Well done!