Call us now

Regent Farm First School

Regent Farm First School

Wansbeck Road South, Gosforth, Newcastle Upon Tyne, Northumberland, NE3 3PE

BRIEF: The staff at Regent Farm First School wanted to redevelop the playground and add new equipment to promote physical activity whilst providing a fun… Full Details

Budget: £15,000 - £20,000

Dart Activity Centre - AC101

£5,708.00 exc. VAT

A-Frame Climbing Blocks - CH129

£1,073.00 exc. VAT

Climbing Wall - CH127

£1,168.00 exc. VAT

Vertical Twisted Net - CH133

£912.00 exc. VAT

Hurdles - CH115

£560.00 exc. VAT

Jelly Board - CH103

£745.00 exc. VAT

Stepping Logs - CH118

£350.00 exc. VAT

Rubber Mulch Safety Surfacing - SUR102

£0.00 exc. VAT

BRIEF: The staff at Regent Farm First School wanted to redevelop the playground and add new equipment to promote physical activity whilst providing a fun play space for the children to use all year round.

We installed items from our Challenger range including a Jelly Board, Balance Beam, Gripped Rope Walk, Vertical Twisted Net, A-Frame Climbing Blocks, Climbing Wall, Stepping Logs and Hurdles. When installed together the trim trail items create a fantastic activity and fitness trail allowing children an opportunity to really challenge themselves physically.

A Dart Activity Centre was also installed into the playground. Our activity centres are hugely popular in primary schools as they cater for all children between the ages of 5 –12. With features such as Tyre Crossing, Clatterbridge, Log Walk, Rope Climb, Climbing Panel, Pull Up Bar and Tyre Swing the Dart provides hours of active fun.

We resurfaced the area underneath the equipment with rubber mulch to prevent soil erosion and allow for all weather use. The rubber mulch also provides a natural woodland look adding to the overall aesthetics of the playground.